55 11 3474-028811 99999-9999
SIGA-NOS

Multimodal operation

Delivery of P58 and P62 Equipment

Delivery of P58 and P62 Equipment

Year: 2011

Operation:
Multimodal operation from Santíssimo (RJ) to Niterói (RJ).

Highlight:
Geometric and structural studies of route between Santíssimo and Niterói indicated that the overland haulage was not feasable. Solving up the issue, part of the crossing was done by coastal navigation between Itaguaí and Sepetiba, both harbors within Rio de Janeiro State.

The equipment was intented to P58 and P62, Brazilian petrol production investment. They are FPSOs (Floading Production Storage and Offloading) platforms, which are going to star up their activities in 2014 and will be able to produce 180,000 and 100,000 petrol barrels per day, respectively.

Transdata also participated in the assembling of the P58 platform modules in Rio Grande (RS).

SPECIFICATIONS

Origin: Itaguaí (RJ)
Destination:  Niterói (RJ)
Cargo Dimensions:
02X 18.65 x 05.10 x 05.10 meters - 74 tonnes
02X 18.65 x 05.10 x 05.10 meters - 35 tonnes
02X 11.70 x 03.95 x 03.70 meters - 30 tonnes
Main Equipment:
Oceanic Barge
Modular Trailers

Photos Gallery

Niteroi-1.jpg
Niteroi-2.jpg
Niteroi-3.jpg
Niteroi-4.jpg
Niteroi-5.JPG
Niteroi-6.jpg