Operation:
Turnkey project: overland / internal haulage, lifting and electromechanical assembling.
Highlight:
The project success is strongly connected to its logistics. About a year of planning preceeded the operation. Method statements were established to overland / internal haulage, erection and electromechanical assembling procedures, and to enable the reception of the over weight/dimension pieces through the offshore port of Barra dos Coqueiros. This port is linked to shore by a 2,6km long narrow bridge.
Barra dos Coqueiros Wind Farm in Sergipe planted 23 SL 1500/82 wind turbines. Its installed capacity can generate 30 MW indexed at 10.5 physical guarantee, enough energy to supply a city of 200,000 inhabitants.
SPECIFICATIONS
Site: Barra dos Coqueiros (SE) |
Main Equipment: |
600-tonne Crawler Crane Narrow Track |
Extendibles |
08-axle line Hydraulic Modular Trailers |