Lifting
Expansion of Refinery in Paulínia
Operation:
Loading, internal haulage and liftiting.
Highlight:
Support for the expansion of the most productive Brazilian petrol refinery aiming to optimize its capacity towards new records settings. Transdata's performance consisted in loading, lifting and installing onto base the equipment for an extension project.
SPECIFICATIONS
Site: Paulínia (SP) |
Dimensions: |
16.83 meters (h) x 03.50 (diam) - 153 tonnes |
20.51 meters (h) x 03.50 (diam) - 177 tonnes |
30.48 meters (h) x 03.82 (diam) - 62 tonnes |
Main Equipment: |
600-tonne Crawler Crane |
400-tonne Hydraulic Gantry System |