Largest Brazilian Petrochemical Complex Deployment

Largest Brazilian Petrochemical Complex Deployment

Year: 2014 / 2015

Operation:
Load out / in operations, barge transport, overland haulage by SPMT's. 

Highlight:
The multimodal operation of the 24 oversized pieces intended to the Brazilian largest petrochemical complex required a special logistic solution, after performing the sea transportation, Transdata moved them by SPMT’s - self-propelled modular trailers through a 10 quilometers path. 

Transdata carried out all the engineering involved and the logistic operational administration: load out / in; barge transportation;  all handling  and overland haulage by SPMT’s. 

The pieces from 24 up to 36 meters width, 05 up to 10 meters length and 07 up to 12 meters high   from 130 to 1,088 tonnes were the largest equipment installed in the plant.  

SPECIFICATIONS

Cargo Dimensions:
32.65 x 07.99 x 07.99 meters - 1,088 tonnes
35.90 x 07.23 x 07.23 meters - 1,061 tonnes
25.27 x 06.33 x 06.46 meters - 760 tonnes
25.10 x 06.33 x 06.71 meters - 754 tonnes
20.76 x 06.31 x 06.20 meters - 586 tonnes
30.73 x 06.81 x 06.81 meters - 430 tonnes
29.77 x 07.21 x 06.78 meters - 417 tonnes
04 X 34.06 x 10.02 x 09.80 meters - 332 tonnes
28.73 x 06.10 x 06.85 meters - 263 tonnes
32.74 x 05.25 x 06.86 meters - 248 tonnes
35.91 x 06.10 x 06.51 meters - 248 tonnes
23.15 x 12.33 x 12.96 meters - 241 tonnes
27.30 x 05.47 x 06.81 meters - 233 tonnes
30.20 x 08.30 x 08.55 meters - 171 tonnes
30.26 x 08.30 x 07.76 meters - 129 tonnes
24.32 x 05.52 x 05.52 meters - 73 tonnes

Photos Gallery

Comperj-1.jpg
Comperj-2.jpg
Comperj-3.jpg
Comperj-4.JPG
Comperj-5.JPG
Comperj-6.JPG
Comperj-7.jpg
Comperj-8.jpg
Comperj-9.JPG
Comperj-91.JPG
Comperj-93.jpg
Comperj-94.jpg
Comperj-95.jpg
Comperj-96.jpg