Multimodal operation from Santíssimo (RJ) to Niterói (RJ).

Highlight:
The four transformers manufactured in Guarulhos traveled to Angra dos Reis Nuclear Power Plant in a multimodal operation that involved the overland haulage from Guarulhos to São Sebastião in the state of São Paulo and transport on a sea barge to Angra dos Reis in Rio de Janeiro.

Ensuring HSE to have zero risk during activities is the priority of Transdata's planning. The engineering team, together with the Transdata field team, establish in advance procedures for lashing, transport, mooring, load out, load in and sea transport to ensure that the work is carried out with the highest level of safety.

SPECIFICATIONS

Origin: Guarulhos (SP)
Destination: Angra dos Reis (RJ)
Cargo Dimensions:
4 X 06.10 x 04.10 x 04.75 m - 120 metric tons
Main Equipment:
8x4 750cv Prime Movers
Set of Axle Lines
Sea Barge

Galeria de Fotos

Angra-1-1.jpg
Load out - Porto de São Sebastião
Angra-1-2.jpg
Load out - Porto de São Sebastião
Angra-1-3.jpg
Load out - Porto de São Sebastião
Angra-1-4.jpg
Load out - Porto de São Sebastião